Estimated costs§5

Prototype / demonstrator budget

Section 5

Estimated costs

Budget for a prototype / demonstrator (not a production military asset), in USD, excluding donor vehicle cost.

Conversion estimator (post-CAD)

Once the CAD design is validated, adjust workshop parameters to get a detailed estimate of total cost and fabrication + installation time. Amounts are convertible to USD, EUR or CAD.

Project parameters

Elevation type

Machining complexity

140 bar
40 bar250 bar
65 $/h
40 $/h120 $/h
60 h
30 h120 h

Display currency

Base USD — 1 $ = 0.92 € = 1.37 C$ (indicative rates).

Total cost estimate

8 230 $

excluding CAD and donor vehicle

Duration (post-CAD)

4.0 wk

20 working days fabrication + installation

Cost breakdown (USD)

ItemCost ($)
Vérin hydraulique400 $
Groupe hydraulique (pompe + réservoir)650 $
Train d’engrenages usiné1 200 $
Manivelle + arbre + roulements260 $
Renfort structurel tourelle1 400 $
Verrouillage / sécurité 90°420 $
Main-d’œuvre (60 h × 65 $/h)3 900 $
Total8 230 $